
|
|
Mechanical
-
HVAC Load Calculation per ASHREA Requirement
-
Ductwork Design
and Layout
-
Split System
Design and Layout
-
Roof-top Unit
Design and Layout
-
Hydronic System
Design and Layout
-
Refrigerant
Piping Design and Layout
-
Shop
Ventilation
-
Combustion Air
Systems
-
Computer and
Data Room Air Conditioning
-
Equipment
Specifications and Selection
Plumbing
|
Electrical
-
Electrical Load
Calculations
-
Lighting Design
and Layout
-
Power System
Design and Layout
-
Communication
Systems Design and Layout
-
DDC Control
Systems
-
Equipment
Specifications and Selection
-
Emergency and
Standby Generation
-
Fire Protection
systems
Foundation Systems
Roof Systems
|

|
|
Electrical Generating Plants
Substations
Transmission Facilities
Distribution Facilities
-
Overhead to 34.5 kV
-
Underground
Industrial Plants
-
P&ID's
-
Electrical Design - AC to 13.8 kV, DC to 250V
-
Piping Design
-
PLC Control System Design
-
HAZOP Facilitation
-
Control Rooms
-
MCC Centers
-
Pipe Racks and Equipment Foundation
-
Hazardous and Non-Hazardous Area Classification
-
Conveying Systems
-
Industrial Boilers
-
Industrial Ovens
-
Ventilation
-
Process Cooling
-
Emission Control
-
Demineralization Plant
|
Pumping and Compressor Stations
-
P&IDs
-
Electrical Design
-
Piping Design
-
PLC Control System Design
-
Control Buildings
-
MCC Centers
-
Pipe Racks and Equipment
Foundation
-
Hazardous and Non-Hazardous Area
Classification
Refineries and
Processing Plants
-
P&IDs
-
Substations
-
Electrical Distribution Design
-
Piping Design
-
Refrigeration
-
PLC Control System Design
-
HAZOP Facilitation
-
Control Buildings
-
MCC Centers
-
Pipe Racks and Equipment
Foundation
-
Hazardous and Non-Hazardous Area
Classification
-
Fire Suppression
Natural Gas Pipe
Lines
-
Meter Stations
-
Control Stations
Communication/Data Systems
-
UHF Radio Systems
-
Copper Cable
-
Fiber Optic Design
-
Planning
-
Physical Design
Water Service
-
Low Pressure De-ionized
-
Boiler Feedwater Service
-
Water Wells
|

|
Contract Administration
Purchasing
-
Complete Procurement
-
Specifying Materials
-
Determining Proper Quantity of Material
Required
-
Obtaining Bids for Materials
-
Issuing Purchase Orders
-
Tracking Materials Through the Distribution
Chain
-
Selecting Contractor Both Prime and Sub
Field Engineering
-
Preparing As-Built Documentation
-
Determining Existing Conditions
-
Field Verifying Dimensions
-
Witness of Electric System Component Testing
Maintenance Procedures
-
Action Procedures
-
Test Equipment Operation
-
Testing Procedures
-
Trouble Location
|
Engineering Studies
-
Arc Flash, Complete with Labels
-
Fault Studies
-
Feasibility
-
Lighting Studies
-
Long Term Power Systems Planning
-
Project Technical Proposals
-
Protective Relay Coordination
-
Load Flow Analysis
-
Equipment Condition Evaluation
-
Reliability of Electrical Systems
-
Structural Evaluation
-
Predominant Use Studies
-
Energy Audits
Custom Multi-Color Labeling
Drawing Reproduction
-
Copy A - E Size Documents and Drawings
-
Scan to File (CD or DVD)
-
Color Plotting A - E Size
-
Black and White Plotting A - E Size
|